zhangjiagang city benk machinery co., ltd.
|
Qty (Set/Sets) | Unit Price (35000.0~45000.0 USD) |
1 | 35000 |
1 + | 45000 |
Payment Terms: | T/T,L/C,D/A,D/P,WU,Paypal,Money Gram |
Place of Origin: | Jiangsu, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Our Company
BENK machinery co.,ltd
has installed over 200 machines in 20 countries across the globe since 2010 and continues to focus on user-friendliness of its machines through re-engineering, making extrusion machinery extremely "Stable" for its users – Easy operation and maintenance is what makes BENK-PM the good brand selling plastic machine today. BENK-PM provides Extrusion solutions for plastic pipe ,profile and board etc.
Product Description
With special designed screw ,barrel, mould and production process ,equipped with series downstream equipment ,this can produce PE /PP/ PVC and wood-plastic composite profiles.This is a new kind of environmental freindly building material. WPC profiles is produced by mixing the plastic ,wood powder ,foam agent and other additives, after high temperature and high pressure ,the products can be used for pallets ,packing plates ,windows and door frames ,decoration panels etc.
technical parameter
Extruder Model | SJZ55/110 | SJZ65/132 | SJZ80/156 | SJZ92/188 | ||
Mian motor power | 22kw | 37kw | 55kw | 110kw | ||
Auxiliary machine | YF200 | YF240 | YF300 | YF600 | YF900 | YF1200 |
Production width | 200 | 240 | 300 | 600 | 900 | 1200 |
vacuum power | 4kwX1 | 5.5kwX1 | 5.5kwX1 | 5.5kwX2 | 5.5kwX1 7.5kwX1 | 5.5kwX1 7.5kwX1 |
water pump | 2.2kw | 2.2kw | 4kw | 5.5kw | 7.5kw | 7.5kw |
hauling speed | 0-5m/min | 0-5m/min | 0-5m/min | 0-3m/min | 0-2.5m/min | 0-2.5m/min |
capacity | 70kg/h | 110kg/h | 110kg/h | 170kg/h | 300kg/h | 300kg/h |
Detailed Images
Co-extrusion design Special design cutter for WPC
Exhibition show
Certifications
Packing
Our Service
1.Technical documents:All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
2.Arrangement for inspection, installation and testing work: BENK will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory. Engineer will give free training lessons to labors in buyer's factory.
3.BENK will provide long-term technical guide.