zhangjiagang city benk machinery co., ltd.
|
Price: | 18000.0 USD |
Payment Terms: | T/T,L/C |
Place of Origin: | Jiangsu, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
Plastic PVC Mixer Machine
SRL-Z PVC Plastic Mixer Machine
It is used in mixing, drying, coloring and other industrial art, it is the ideal equipment for producing profile and pipe.
It is heating mixing has self-friction electric heating
Two layers of sealing is adopted in the pot cover, pot cover of cooling machine adopts arch cover, which can avoic deforming
It has features of contact construction, good performance
They have passed the test of dynamic balance and static equilibrium
Vertical type of parameter | |||||
Parameter/model | SRL-Z50/100A | SRL-Z100/200A | SRL-Z200/500A | SRL-Z300/600A | SRL-Z500/1000A |
Total volume(L) | 50/100 | 110/200 | 200/500 | 300/600 | 500/1000 |
Effective volume(L) | 37/70 | 75/130 | 150/320 | 225/384 | 375/640 |
Oar speed(rpm) | 510/1013/118 | 650/1300/130 | 484/967/110 | 480/964/100 | 413/830/71 |
Motor power(Kw) | 7/11/7.5 | 14/22/11 | 30/42/11 | 40/55/11 | 47/67/15 |
Heating & cooling | Self-friction/water | ||||
Discharge | pneumatic | ||||
weight(T) | 2.8 | 3 | 3.5 | 3.8 | 5.8 |
more pictures:
mixing machine
mixing tank made by 6mm stainless steel
mxing saw blade
cover open by penumatic
material discharge by penumatic
FAQ:
Q: How about the spare parts?
A: We will send one year enough easy broken spare parts together with the machine when shiped.
During the warranty time, we will supply the spare parts with our cost including the delivery fees
Q: How to install my machines when it arrives? how much the cost?
A: We will send engineers to your factory to install the machines and train your staff how to operate the mahcines.
Customer pay airtickets go and back, accommodation and USD80/day/Engineer.
Q: When can I get m machine after paid?
A: Usually it cost about 30-60 days, the exactly depend on what kind of machine you order. the shipping time is based on your destination port.
Q: What is your guarantee or warranty of the quality if we order your machines?
A: We offer high quality machines with 13 month guarantee since B/L issued, and supply life-long technical support.
Q: Are you a trading company or manufacture?
A: We are a manufacture, we supply the factory price with high quality, welcome to visit!
3, BENK's Service:
3.1 Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
3.2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. BENK will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's factory.
e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
3.3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
b. Guarantee period and after-sales services: 13 months since date of bill of loading
During this guarantee period, BENK will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, BENK will provide the buyer spare parts at cost price.
c. Long-term service:
BENK will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
We thank you for your inquiry and would be pleased to receive your order soon.
ZHANGJIAGANG CITY BENK MACHINERY CO., LTD.