QR Code QR Code
Post Offer Free
zhangjiagang city benk machinery co., ltd.
zhangjiagang city benk machinery co., ltd.  

Gold Index: 22681

You are here: home  > Plastic Mixer Machine  > BENK Machinery China plastic Mixer manufacture

BENK Machinery China plastic Mixer manufacture 

Price: 18000.0 USD 
Payment Terms: T/T,L/C 
Place of Origin: Jiangsu, China (Mainland) 
inquire skype
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: kpm
Production Capacity: 0-200sets per year
Delivery Date: 50 working days after depos...
model: KPM-SRL-Z500/1000
mixing time each times: 8-10min
effective volume: hot 325L cool 650L
speed control: 75KW ABB inverter
color: according to your idea
Means of Transport: Ocean
Packing: suitable sea transport pack...
Brand Name: BENK
capacity: 120-400KG
total volume: hot 500L cool 1000L
hot mixing motor: 75KW SIEMEN motor
cool mixing motor: 15KW
certificate: CE ISO9001

1, heating by electrical and slf friction
2, cooling by water
3, 75KW XIEMENS motor + ABB inverter
4, cooling motor with reduce
5, penumatic unloa

BENK Machinery China PVC Mixer Manufacture

BENK Machinery China plastic Mixer manufacture


Features 

1.The materials after heat mixing can be got into cool mixer for cooling automatically,prevent agglomeration.

2.Its has self-friction and electric heating functions.

3.Dual-sealing is adopted in  the pot cover. Pot cover of cooling machine adopts arch cover,which can avoid deforming.

4.It has features of compact structure and good-looking appearance.

5.They have passed dynamic and static balance test.


Parameters

ModelSRL-Z300/1000SRL-Z500/1600 SRL-Z800/2000
Total capacity(L)300/1000500/1600 800/2000
Effective capacity (L )200/640375/1200 600/1280
Mixer speed (rpm)475/950/110430/960/50 370/740/50
Motor power (KW )40/55/15/955/75/18.5/12 83/110/30/15
Heating Methodelectricelectric electric

 

Discharge Method

pneumatiacpneumaticpneumatic
 Dimension(mm)4980*
2500*2740
4680*
3000*4120

 5260*

3200*4378

 Weight(t)4.28.5 9.5


more pictures:

installation in client's factory

material discharge by penumatic


cover move by penumatic


Q: How about the spare parts?

A: We will send one year enough easy broken spare parts together with the machine when shiped.

  During the warranty time, we will supply the spare parts with our cost including the delivery fees
 

Q: How to install my machines when it arrives? how much the cost?

A: We will send engineers to your factory to install the machines and train your staff how to operate the mahcines.

    Customer pay airtickets go and back, accommodation and USD80/day/Engineer.
 

Q: When can I get m machine after paid?

A: Usually it cost about 30-60 days, the exactly depend on what kind of machine you order. the shipping time is based on your destination port.
 

Q: What is your guarantee or warranty of the quality if we order your machines?

A: We offer high quality machines with 13 month guarantee since B/L issued, and supply life-long technical support.
 

Q: Are you a trading company or manufacture?

A: We are a manufacture, we supply the factory price with high quality, welcome   to visit!



3, BENK's Service:

3.1 Technical documents

All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.

 

3.2. Arrangement for inspection, installation and testing work

a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc. 

b. BENK will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.  

c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.

d. Engineer will give free training lessons to labors in buyer's factory.

e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.

 

3.3. Quantity and quality guarantee

a. Quantity/Quality Discrepancy to destination port during transportation:

In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.

b. Guarantee period and after-sales services: 13 months since date of bill of loading

During this guarantee period, BENK will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, BENK will provide the buyer spare parts at cost price. 

c. Long-term service:

BENK will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.


We thank you for your inquiry and would be pleased to receive your order soon.

 

ZHANGJIAGANG CITY BENK MACHINERY CO., LTD.



Mr. Amon
skype Mr. Amon
sales manager
Tel: 86-153-06243469
Fax: 86-512-58901341
Mobile: 86- 153 0624 3469
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Related Products

Company Info

zhangjiagang city benk machinery co., ltd. [China (Mainland)]


Business Type:Manufacturer, Trading Company
City: Suzhou
Province/State: Jiangsu
Country/Region: China (Mainland)

Follow Us: Follow us on facebook Follow us on linkedin Follow us on Twitter

Amon:   skype
Amon:   qq

You May Like: