QR Code QR Code
Post Offer Free
zhangjiagang city benk machinery co., ltd.
zhangjiagang city benk machinery co., ltd.  

Gold Index: 22681

You are here: home  > Plastic Mixer Machine  > hot-cool pvc mixing system

hot-cool pvc mixing system 

Price: 13000.0 USD 
Payment Terms: T/T,L/C 
Place of Origin: Jiangsu, China (Mainland) 
inquire skype
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: KPM-SRL-Z300/600
Production Capacity: 0-200sets per year
Delivery Date: 35 working days after depos...
model: KPM-SRL-Z300/600
mixing time each times: 8-10min
effective volume: hot 225L cool 375L
speed control: 42KW
color: according to your idea
Means of Transport: Ocean
Packing: suitable sea transport pack...
Brand Name: BENK
capacity: 350-500KG
total volume: hot 300L cool 600L
hot mixing motor: 38/42KW SIEMEN motor
cool mixing motor: 11KW
certificate: CE ISO9001

1, SRL-Z300/600 hot-cool PVC mixer
2, 350-500KG output
3, 42KW XIEMENS motor + ABB inverter
4, 11KW cool mixing motor
5, penumatic unload


KPM-SRL-Z300/600 hot-cool plastic mixing machine


1. KPM -SRL-Z hot-cool mixer introduction:

SRL-Z series mixed unit is applicable for mixture, coloring and drying of various resin such as polyethylene,  polypropylene, polyvinyl, chloride etc. and in the process of drying and volatilization of engineering plastic such as  ABS, polycarbonate etc. before forming and processing as well as in the mixture of phenolic resin. This unit combines heat mix and cool mix together the materials after heat mix can get into cool mix for cooling automatically, exhausts remaining gasses avoids agglomerates.  


features & function:

1) It is used in mixing, drying, coloring and other processing. It is the most ideal equipment for producing shaped plastic material and plastics pipes. 

2) The technology of the main shaft sealed apparatus has got the state patent and it has two functions of electric and steam heating.
3) Two layers of sealing technology is adopted in the pot cover. The opening of the heating mixed cover adopted the airopening device and the opening of the cooling mixed cover adopted hydraulic pressure control system.
4) The electric control section with the programmable logic control adopted wellknown imported meters and control components.
5) It is equipped with the pulse dust-cleaning recovery device.
6) The blades have been passed the test of the dynamic and static balance testing machine.
7) You may choose the simple and easy feeding system


reference pics:

normal styel mxier:


horizontal style:


unload by penumatic:


cover open by penumatic:


pictures from client's factory installation:


2. main techncial parameters:

Model

SRL-Z50/100

SRL-Z100/200

SRL-Z200/500

SRL-Z300/600

SRL-Z500/1000

Capacity (L)

50/100

100/200

200/500

300/600

500/1000

Effective Capacity (L)

37/70

100/200

150/320

225/390

375/640

Motor power(kw)

7/11/7.5

14/22/11

30/42/11

40/50/11

55/75/18.5

Paddle (rpm)

510/1020/118

650/1300/130

450/960/110

480/960/100

440/880/70

 

Heating/cooling Method

 

 

Electric heat and self-friction

/Water-cooling

 

Weight(kg)

2100

3000

3500

3800

5200

 

3, BENK's Service:

3.1 Technical documents

All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.

 

3.2. Arrangement for inspection, installation and testing work

a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc. 

b. BENK will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.  

c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.

d. Engineer will give free training lessons to labors in buyer's factory.

e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.

 

3.3. Quantity and quality guarantee

a. Quantity/Quality Discrepancy to destination port during transportation:

In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.

b. Guarantee period and after-sales services: 13 months since date of bill of loading

During this guarantee period, BENK will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, BENK will provide the buyer spare parts at cost price. 

c. Long-term service:

BENK will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.


 

We thank you for your inquiry and would be pleased to receive your order soon.

 

ZHANGJIAGANG CITY BENK MACHINERY CO., LTD.



Mr. Amon
skype Mr. Amon
sales manager
Tel: 86-153-06243469
Fax: 86-512-58901341
Mobile: 86- 153 0624 3469
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Related Products

Company Info

zhangjiagang city benk machinery co., ltd. [China (Mainland)]


Business Type:Manufacturer, Trading Company
City: Suzhou
Province/State: Jiangsu
Country/Region: China (Mainland)

Follow Us: Follow us on facebook Follow us on linkedin Follow us on Twitter

Amon:   skype
Amon:   qq

You May Like: