zhangjiagang city benk machinery co., ltd.
|
Price: | 65000.0 USD |
Payment Terms: | T/T,L/C |
Place of Origin: | Jiangsu, China (Mainland) |
Add to My Favorites | |
HiSupplier Escrow |
PVC granulating machine unit
PVC twin screw granule making machine
1.about product
This pelletizing machine is composed by a conical twin-screw extruder and the correspondingly pelletizing downstream equipment, it is suitable for the pelletizing of PVC, PE raw materials with wood powder or other additives. The pellets produced by this machine is evenly, solid, elegance. The pelletizing downstream equipment is the die face cutter, air transferring unit, vibration separating and cooling unit. This pelletizing downstream equipment has the features of high automation and high production efficiency.
reference pics:
whole line:
granules cutter:
2. Main technical parameters:
extruder | SJZ92/188 conical double screw extruder |
capacity | 500KG |
installation size | 15*2*2.8M |
installation power | 171.5KW |
granule size | 3.5mm |
cutting blade | 3pcs |
other models:
Model | SJ-55 | SJ-65 | SJ-80 | SJ-92 |
Transmission power (kw) | 22 | 37 | 55 | 110 |
Screw diameter(mm) | 55~110 | 65~132 | 80~156 | 120 |
Particle size(mm) | Φ3~Φ4 | Φ3~Φ4 | Φ3~Φ4 | Φ3~Φ4 |
Screw rotation speed r/min. | 73 | 90 | 90 | 90 |
Extrusion capacity kg/h | 100~120 | 220~260 | 320~450 | 650~800 |
3, BENK's Service:
3.1 Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
3.2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. BENK will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's factory.
e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
3.3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
b. Guarantee period and after-sales services: 13 months since date of bill of loading
During this guarantee period, BENK will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, BENK will provide the buyer spare parts at cost price.
c. Long-term service:
BENK will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
We thank you for your inquiry and would be pleased to receive your order soon.
ZHANGJIAGANG CITY BENK MACHINERY CO., LTD.