zhangjiagang city benk machinery co., ltd.
|
Price: | 6000.0 USD |
Payment Terms: | T/T |
Place of Origin: | Jiangsu, China (Mainland) |
View the Video: |
Add to My Favorites | |
HiSupplier Escrow |
SWP400 PVC pipe crusher
SWP400 waste PVC pipe crushing machinery
SWP Series Plastic Pipe Crusher/Waste Plastic Materials Crushing Machine
1,this series crushing machine is mainly used for waste plastic pipe shredding and recycling
2,have several types with different crushing capacity150-450kg/h
3,knife and blades crushing method,with good working efficiency,materials adopted 9CrSi,long working life,and slao it can be sharpened again
4,the size after crushing can be 6mm,8mm,10mm,12mm accord your customers demands
main technical parameters:
Model | SWP150 | SWP200 | SWP210 | SWP300 | SWP320 | SWP380 | SWP400 | SWP630 |
Diameter of turning knife(mm) | 150 | 200 | 210 | 300 | 320 | 380 | 400 | 630 |
Number of turning knife | 9 | 3 | 3 | 3 | 6/2 groups | 12/4 groups | 5 | 9/3 |
Turing speed of knife(r/min) | 730 | 870 | 500 | 640 | 650 | 650 | 500 | 480 |
Number of fixed knife | 2 | 2 | 2 | 3 | 2 | 8/4 groups | 2 | 4/2 |
aperture of screen panel | φ 8 | φ 8 | φ 8 | φ 12orφ 14 | φ 8 | φ 10 | φ 10 | φ 10 |
Crushing capacity(kg/h) | 60-200 | 50-110 | 80-120 | 50-250 | 250-350 | 100-400 | 350-450 | 700-850 |
power | 5.5 | 4 | 4 | 37 | 11 | 27.5 | 13.2 | 44 |
Current source | 380V50Hz | |||||||
Size of feeding gate(mm) | 150× 200 | 240× 350 | 250× 230 | 260× 1200 | 500× 280 | 268× 1120 | 375320 | 820610 |
weight(kg) | 300 | 320 | 2000 | 1400 | 800 | 980 | 5000 | |
Outline dimension(mm) | 1200*820 *1160 | 1000*590 *1090 | 800*600 *1400 | 1550*1300 *1850 | 1613*1150 *1910 | 1800*1460 *1380 | 2500*1200 *2000 | 2500*1550 *2850 |
reference pictures:
from client
ready to delivery in factory
3, BENK's Service:
3.1 Technical documents
All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.
3.2. Arrangement for inspection, installation and testing work
a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc.
b. BENK will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.
c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.
d. Engineer will give free training lessons to labors in buyer's factory.
e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.
3.3. Quantity and quality guarantee
a. Quantity/Quality Discrepancy to destination port during transportation:
In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.
b. Guarantee period and after-sales services: 13 months since date of bill of loading
During this guarantee period, BENK will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, BENK will provide the buyer spare parts at cost price.
c. Long-term service:
BENK will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.
We thank you for your inquiry and would be pleased to receive your order soon.
ZHANGJIAGANG CITY BENK MACHINERY CO., LTD.