QR Code QR Code
Post Offer Free
zhangjiagang city benk machinery co., ltd.
zhangjiagang city benk machinery co., ltd.  

Gold Index: 22686

You are here: home  > Washing Recycling Machine  > PE/PP bottle recycling line washing machine

PE/PP bottle recycling line washing machine 

Price: 50000.0 USD 
Payment Terms: T/T,L/C 
Place of Origin: Jiangsu, China (Mainland) 
inquire skype
Add to My Favorites
HiSupplier Escrow
Share |

Product Detail

Model No.: KPM-W300
Production Capacity: 100SETS /YEAR
Delivery Date: 50 working days after depos...
recycling raw material: Pe/PP bottle
instalaltion power: 50-200KW
INVERTER: ABB
color: according to your idea
installation size: 34*4*4M
Means of Transport: Ocean
Packing: suitable sea transport pack...
Brand Name: BENK
washing capacity: 100-1000KG
motor: SIEMENS
voltage: 380V or according to you lo...
certificate: CE ISO9001
condition: new

1, PE PP bottle washing recycling machine
2, capacity 100-1000KG
3, isntallation size 34X4X4M
4, ABB inverter
5, SIEMENS motor

PE/PP bottle washing line 

PE/PP bottle recycling line washing machine


machine description:

  • PE, PP  Washing Line is also called PE, PP crushing, washing, dewatering and drying line. 

    We can supply production line with capacity from 100kg/h to 1000kg/h.

     

  • We can design different pp/pe recycling line for you according to your request: 

    1: There are different capacity can be supplied: 200-300kg/h, 500-800kg/h, 800-1000g/h. 

    2: You can choose different devices according to your material. 

    3: According to your country condition, you can choose full automatic line or semi-automatic line. 

    4: You can purchase separate device based on your own conditions. 

    5: We providing turn-key project for you. Design-product-installment-testing. 


reference pics:

whole line:


convey belt + crusher + hot washer

high speed friction washer:

floating washer:

Dewatering machine


pipe drying system +  silo


machine list & main technical parameters:

Name

 (KW)

Motor power

 (mm)

dimension

 (T/H)

Water consumption

 (mm)

Stainless steel standard

Electric standard

Belt conveyor

1.5KW

4000*600*2100mm

-

-

According to

customer's standard

Crusher

37KW

1800*1500*3000mm

0.6-1.0

-

Screw charger

1.5KW

3300*420*1600mm

-

3-5

Floating washing tank

2.2*2KW

6000*1250*1700mm

4-5

3-5

High speed friction washing machine

22KW

3200*1200*1800mm

1-2

3-5

Screw charger

1.5KW

3000*420*1460mm

-

3-5

Dewatering machine

45KW

1750*1420*1770mm

-

5

Storage for transition

-

1200*1000*3000mm

-

-

Drying system

28KW

3700*1000*2000mm

-

3-5

Storage hopper

2.2KW

3700*1500*3500mm

-

-

Electric cabinet

-

2000*450*1780mm

-

-



3, BENK's Service:

3.1 Technical documents

All the symbols on the equipments should be in English. Seller is responsible to provide general layout plan, electric plan, installation direction, and manual book in English to Buyer on time.

 

3.2. Arrangement for inspection, installation and testing work

a. After all machines are delivered to customer's factory; Buyer is responsible for all preparation work, e.g. electricity supply, water supply, labors and cranes, etc. 

b. BENK will prepare for visa application for their engineers, who are responsible for guide of machine installation and testing at the Buyer's factory.  

c. The Buyer will buy the round-trip air ticket for Engineer if visa application is approved. The buyer is also responsible to bear expenses generated, e.g. visa formalities, meals, accommodation and allowance of USD80 per day for each engineer.

d. Engineer will give free training lessons to labors in buyer's factory.

e. If buyer doesn't request installation and commissioning by Seller's engineer in 4 months since date of bill of lading, which to be accounted all the machines has been successfully tested by buyer.

 

3.3. Quantity and quality guarantee

a. Quantity/Quality Discrepancy to destination port during transportation:

In case of quality/quantity discrepancy to destination port in transportation, customer should file claim within 30 days after the arrival of the goods at port of destination. Insurance company and shipping company will be responsible for any discrepancy of the goods caused by shipping company and other transportation organization and/or post office.

b. Guarantee period and after-sales services: 13 months since date of bill of loading

During this guarantee period, BENK will provide spare parts without any charge in case of quality discrepancy caused by us. If the malfunctions are caused by your incorrect operations, BENK will provide the buyer spare parts at cost price. 

c. Long-term service:

BENK will charge the buyer cost price of spare parts beyond one year and provide long-term technical guide.


 

We thank you for your inquiry and would be pleased to receive your order soon.

 

ZHANGJIAGANG CITY BENK MACHINERY CO., LTD.



Mr. Amon
skype Mr. Amon
sales manager
Tel: 86-153-06243469
Fax: 86-512-58901341
Mobile: 86- 153 0624 3469
Contact to this supplier

Didn't find what you're looking for? Post Buying Lead or contact HiSupplier Customer Service Center  for help!

Related Search

Find more related products in following catalogs on Hisupplier.com

Related Products

Company Info

zhangjiagang city benk machinery co., ltd. [China (Mainland)]


Business Type:Manufacturer, Trading Company
City: Suzhou
Province/State: Jiangsu
Country/Region: China (Mainland)

Follow Us: Follow us on facebook Follow us on linkedin Follow us on Twitter

Amon:   skype
Amon:   qq

You May Like: