PVC PIPE EXTRUSION MACHINE INSTALLATION FINISHED IN 3 DAYS for Argentina client
PVC PIPE EXTRUSION MACHINE INSTALLATION FINISHED IN 3 DAYS for ARGENTINA CLIENT
Thanks for our engineer's hard work, just 3 days 50-160mm PVC pipe extrusion line finished instalaltion and start producing in Argentina client's factory.
And thanks for client cooperation, preapare all required thing in advance, like water, air, power.
this is a short trip for engineer, but it is an good thing for client, they can start production as quick as hope.
This is Zhangjiagang city Benk machinery company's after-sale team.
below pictures is this time instalaltion pvc pipe extrusion machine and an SRL-Z300/600 PVC mixing machine.
50-160mm PVC pipe extrusion line
SRL-Z300/600 hot-cool PVC mixing machine
If you have the same require, Zhangjiagang City Benk Machinery Co., ltd. will be a good choice.